MTD 248-604A Instrukcja Instalacji Strona 11

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 42
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 10
IM 1083 Self-Contained WSHP Unit Ventilator Models ARQ, ERQ, GRQ Page 11 of 42
Figure 15: 21⅞" (556mm) Deep Full Adapter Back Unit and
Floor Level Outdoor Intake Louver Location
Figure 18: 21⅞" (556mm) Deep Partial Adapter Back Unit
with Open Refrigerant Pipe Chase and Floor Level
Outdoor Intake Louver Location
Intake Louver
Not More
Than 12"
Figure 16: 21⅞" (556mm) Deep Full Adapter Back Unit
with High Louver Application
Not More
Than 28"(711mm)
Louver
Field Supplied
Water Piping
Important: Gasket sealing
surface is required.
Lintel
(By Others)
Unit Refrigerant Piping
Floor Line
Sealed Cement
Mortar;
Pitch Away From Unit
Important: Gasket sealing
surface is required.
Louver
Lintel (By Others)
Unit Refrigerant Piping
Field Supplied
Water Piping
Unit Refrigerant Piping
Field Supplied
Water Piping
Important: Gasket sealing
surface is required.
Louver Installation With Typical Unit Arrangements – 21⅞" Unit Depth
Lintel
(By Others)
Gasket Seal
Floor Line
Floor Line
1"
(25mm)
1"
(25mm)
Sealed Cement
Mortar;
Pitch
Away From Unit
Sealed Cement
Mortar;
Pitch Away
From Unit
Intake Louver
Not More
Than 28"
Unit Refrigerant Piping
Lintel
(By Others)
Sash
Floor Line
Sealed Cement
Mortar;
Pitch Away
From Unit
Important: Gasket sealing
surface is required.
2" Finished Step-Down Top
Figure 17: 21⅞" (556mm) Partial Adapter Back Unit with
Window Below Unit Top (2" Step-Down) and Floor Level
Outdoor Intake Louver Location
Przeglądanie stron 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 41 42

Komentarze do niniejszej Instrukcji

Brak uwag